DTF Printer Supplier Scorecard: A Free Checklist to Compare Quotations Fairly

November 23, 2026

Latest company blog about DTF Printer Supplier Scorecard: A Free Checklist to Compare Quotations Fairly

Most DTF printer quotations are not comparable. One supplier quotes a 60 cm machine with two heads and a shaker; another quotes the same width with four heads and no shaker; a third quotes the printer only and mentions film separately. Comparing the bottom line of those three documents is not a price comparison — it is a guess.

This scorecard fixes that. Print it, or copy the structure into a spreadsheet, and give every supplier the same scorecard with the same questions. Weight the criteria for your own business — a shop printing 40 m² a day and an exporter running three shifts do not need the same machine.

The Scorecard

A. Hardware configuration (40 points)

Item What to record Points
Head model and countXP600 / i3200, number fitted, spare positions10
Print widthMaximum film width and usable width6
Powder shakerIncluded, dwell time, recirculation, waste recovery10
Dry/cure pathTemperature control, humidity handling, film tension8
Frame and motionRail type, motor, chassis rigidity6

B. Consumables and running cost (25 points)

Item What to record Points
InkType, pigment load, g/m², price per litre8
Hot-melt powderMesh size, cure temperature, g/m², price/kg8
PET filmThickness, hot/cold peel, price/m²6
Cost per m²Calculated, all inputs included3

C. Commercial terms (15 points)

  • Warranty coverage (5) — heads included or excluded, duration per component
  • Spare-part list (5) — priced, stocked items, lead time in days
  • Payment terms (5) — deposit balance, platform protection, company account with invoice

D. Support and risk (20 points)

  • Response SLA (6) — hours to first technical reply, video call availability
  • Language and time zone (4) — engineer, not script-reader
  • References (6) — two customers in your market, same model
  • Compliance documents (4) — CE for machine, appropriate documents for ink and powder

How to Score Without Bias

  1. Send one identical RFQ to every candidate, in the same format, with your real fabric mix and output target.
  2. Score only what is written, not what is promised on a call. Undocumented promises score zero.
  3. Score cost per square meter, never machine price alone. It is the only number that predicts profit.
  4. Reward disclosure. A supplier who tells you which components they buy in, and which they make, is more trustworthy than one who claims to make everything.
  5. Re-score after the demo, using the filmed print of your own artwork on your own fabric.

Interpreting the Result

Total Interpretation
85-100Shortlist for a trial order; verify references and paperwork
70-84Viable, but negotiate the missing documentation into the contract
55-69Use only for consumables or a low-risk first order
Below 55Walk away, regardless of price

Run the scorecard on us. Andemes will send the hardware specification, ink and powder datasheets, film data, spare-part price list, warranty terms and support hours in one pack — so you can score us on the same page as everyone else.

Request the full documentation pack →

Bottom Line

Supplier ranking stops being a mystery once you quantify it. Same questions, same weights, documented answers only — and the difference between a machine that pays for itself in a year and one that eats your margin becomes visible before you place the order.